Hi ,
The bullet graph works with the weighted average as below say Prj1 :16.67 and Prj2 : 52.50 if we take simple average it shows 37.14 but we just want the simple average of these two says (16.67+52.50)/2 = 34.585.
The scenario is explained with the exact simple example .Kindly help us.
In this scenario we need average value @ Project level is 39.165.
But we are getting 38.57.
If anyone have any solution please let us know to solve the issue.