Hello,
My table is a list of issues. Those issues are can last from 1 to a few days. Some are predicted and some aren't.
My table is the list for each day (when there is a problem) of each issue with a planned/unplanned tag.
The table is as follow:
Issue number
Date
Type (planned/unplanned)
Planned can be predicted therefore, there are issues with dates in the future. Unplanned aren't predictable, and therefore there aren't any dates in the futures for those. I would like to create futures issues myself.
How could i do it automatically and have the result added to my table so I can actually forecast issues in the future ?
Hope this is clear
Guilhem