Hi,
I was wondering if there is any way to emulate support for drilling down a date field to levels lower than day.
I can see that in PBI desktop, currently, a date/time field is already broken into Year,Quarter,Month,Day and I can drill down to these levels to see various aggregations of my visuals.
What I was wondering is that if my date/time is in the formst YYYY/MM/DD HH:MM then is there any way to also drill down to HH and MM levels for the plotted data? If it is not supported out of the box, is there a way to emulate this behavior?
Thanks
Ali