Quantcast
Channel: Desktop topics
Viewing all articles
Browse latest Browse all 217117

Calculate quantity built based on 2 x 12 hour shift pattern

$
0
0

Hi,

 

I have a table that provides me with a quantity build and the date/time that item was built. We are moving to a 2 x 12 hour shift pattern runny 7am to 7pm and then 7pm to 7am.

 

I want to break down the quantity built into these shifts so we can see productiuvity. How would I go about doing so?

 

Thanks

 

Craig


Viewing all articles
Browse latest Browse all 217117

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>