I want to have a constant line that will be able to change when I sort through staff. I have a line chart that shows hours worked, and I want a contant line to show where employee is required to be. The hours required changes for each employee, so i would need to change the constant lines number every time. I have a measure that is "hour worked target". Since I cant add a measure to the constant line, does anyone have any ideas?
↧